Moving in 2019

Getting to Grangegorman - 2019 

In September 2019, programmes currently operating in the Cathal Brugha Street Campus, the Kevin Street Campus and part of the Rathmines Campus will transfer to two new structures known as the Central and East Quads. In addition, the programmes that transferred in 2014 from Mountjoy Square, Portland Row and Temple Bar will transfer from the newly refurbished buildings to the East Quad. By then, the layout of the campus will be as shown in the graphic below (prepared by Conor Cassidy 3rd year DT117).

This will bring the number of students on campus to just over 10,000.

Campus Layout 2017

The National Transport Authority has developed an excellent Journey Panner (link here) to assist you is finding your most appropriate means of public transport to the campus. 

A comprehensive compilation of directions to the campus covering all currently available means of transport can be found at this link.  

 

Programmes based on the new City Campus from September 2019

All of the Undergraduate and Post Graduate programmes from the following Schools. Click on each link to go to the relevant School

College of Sciences & Health

College of Arts & Tourism

College of Engineering & Built Environment

Back to top